Turbinë me avull1. Brněnská strojírna
Turbogenerator set 25MW
Turbinë me avull
1. Brněnská strojírna
Turbogenerator set 25MW
EXW VB plus TVSH
680 000 €
viti i prodhimit
1985
Gjendje
I përdorur
Vendndodhje
Republika Çeke 

Fotot tregojnë
Shfaq hartën
Të dhëna për makinën
- Përshkrimi i makinës:
- Turbinë me avull
- Prodhues:
- 1. Brněnská strojírna
- Model:
- Turbogenerator set 25MW
- Viti i prodhimit:
- 1985
- Gjendje:
- i përdorur
- Funksionalitet:
- plotësisht funksionale
Çmimi & Vendndodhja
EXW VB plus TVSH
680 000 €
- Vendndodhje:
- 689/117, Vratimovská, 719 00 Slezská Ostrava

Telefononi
Detaje teknike
- Presion:
- 90 shufër
- Fuqi:
- 25 kW (33,99 HP)
- Frekuenca e hyrjes:
- 50 Hz
- Lloji i rrymës hyrëse:
- Kondicioner ajri
- Temperatura:
- 515 °C
- Peshë totale:
- 45 000 kg
- Lartësia totale:
- 5 000 mm
- Shpejtësia rrotulluese (maks.):
- 3 000 rrot/min
- Lloji i ftohjes:
- ujë
Detajet e ofertës
- ID e shpalljes:
- A19313346
- Numri i referencës:
- TG1
- Përditësim:
- së fundmi më 06.06.2025
Përshkrim
1. Brněnská strojírna, Turbogenerator set, back pressure steam turbine 25MW
Manufacturer: 1. Brněnská strojírna
Power: 25 000 kW
Type: R25-9/1,9
RPM: 3000 / min
Steam pressure: 90 bar
Output steam pressure: 18 bar
Steam temperature: 515 ºC
The equipment is from year 1985 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 3 000 x 3 000 x 5 100 mm
Weight: 45 000 kg
Generator, gearbox, oil system and all related electro and InC equipment included.
We will send all technical data on request.
Maintenece:
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. The O&M was carried out by the turbine manufacturer or a specialist company in the field.
The last O&M was carried out in 2007 for a total amount of 44.2 million EUR. The following repairs were carried out:
- repair of the rotor with new blading
- repair of the stator flow section with new blading
- Replacement of quick-action and control valve blocks
- replacement of the control gear on the machine,
- reconstruction of the control system
- repair of oil. system,
- revision of steam system, valves, drainage
The last repair (SO) was carried out in 2020 for a total amount of 16.2 million CZK. The following repairs were carried out:
- revision of the flow section of the turbine, cleaning, replacement of seals, rotor balancing
- oil revision and cleaning. Revision of the rotor, cleaning of the rotor, revision of the rotor system, installation of full flow filtration
- complete repair of the KUP with repiping,
Nwedewqp Acjpfx Ahzon
- revision and repair of the turbine control and the control safety system
- inspection of steam pipelines and valves
Regular maintenance and servicing was carried out during operation, with further periodic repairs planned for 2027.
Manufacturer: 1. Brněnská strojírna
Power: 25 000 kW
Type: R25-9/1,9
RPM: 3000 / min
Steam pressure: 90 bar
Output steam pressure: 18 bar
Steam temperature: 515 ºC
The equipment is from year 1985 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 3 000 x 3 000 x 5 100 mm
Weight: 45 000 kg
Generator, gearbox, oil system and all related electro and InC equipment included.
We will send all technical data on request.
Maintenece:
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. The O&M was carried out by the turbine manufacturer or a specialist company in the field.
The last O&M was carried out in 2007 for a total amount of 44.2 million EUR. The following repairs were carried out:
- repair of the rotor with new blading
- repair of the stator flow section with new blading
- Replacement of quick-action and control valve blocks
- replacement of the control gear on the machine,
- reconstruction of the control system
- repair of oil. system,
- revision of steam system, valves, drainage
The last repair (SO) was carried out in 2020 for a total amount of 16.2 million CZK. The following repairs were carried out:
- revision of the flow section of the turbine, cleaning, replacement of seals, rotor balancing
- oil revision and cleaning. Revision of the rotor, cleaning of the rotor, revision of the rotor system, installation of full flow filtration
- complete repair of the KUP with repiping,
Nwedewqp Acjpfx Ahzon
- revision and repair of the turbine control and the control safety system
- inspection of steam pipelines and valves
Regular maintenance and servicing was carried out during operation, with further periodic repairs planned for 2027.
Ofrues
Shënim: Regjistrohuni falas ose hyni, për të parë të gjitha informacionet.
Dërgo kërkesë
Telefon & Faks
+420 370 ... njoftime
Këto njoftime mund t'ju interesojnë edhe ju.
njoftim i vogël
Republika Çeke
973 km
Turbinë me avull
1. Brněnská strojírnaTurbogenerator set 25MW
1. Brněnská strojírnaTurbogenerator set 25MW
njoftim i vogël
Republika Çeke
973 km
Turbinë me avull
1. Brněnská strojírnaTurbogenerator set 25MW
1. Brněnská strojírnaTurbogenerator set 25MW
Njoftimi juaj u fshi me sukses
Ndodhi një gabim



























































