Turbinë me avullŠkoda Plzeň
Turbogenerator set 25MW
Turbinë me avull
Škoda Plzeň
Turbogenerator set 25MW
EXW VB plus TVSH
1 700 000 €
viti i prodhimit
1995
Gjendje
I përdorur
Vendndodhje
Republika Çeke 

Fotot tregojnë
Shfaq hartën
Të dhëna për makinën
- Përshkrimi i makinës:
- Turbinë me avull
- Prodhues:
- Škoda Plzeň
- Model:
- Turbogenerator set 25MW
- Viti i prodhimit:
- 1995
- Gjendje:
- i përdorur
- Funksionalitet:
- plotësisht funksionale
- Orë pune:
- 201 000 h
Çmimi & Vendndodhja
EXW VB plus TVSH
1 700 000 €
- Vendndodhje:
- 117, Vratimovská 689, 719 00 Slezská Ostrava, Czechia

Telefononi
Detaje teknike
- Presion:
- 19 shufër
- Fuqi:
- 25 000 kW (33 990,50 HP)
- Frekuenca e hyrjes:
- 50 Hz
- Temperatura:
- 320 °C
- Peshë totale:
- 93 000 kg
- Shpejtësia rrotulluese (maks.):
- 3 000 rrot/min
- Gjatësia totale:
- 6 200 mm
- Lloji i ftohjes:
- ujë
Detajet e ofertës
- ID e shpalljes:
- A19313656
- Numri i referencës:
- TG3
- Përditësim:
- së fundmi më 06.06.2025
Përshkrim
Škoda Plzeň, Turbogenerator set, condensate steam turbine 25 MW
Manufacturer: Škoda Plzeň
Power: 25 000 kW
Type:
RPM: 3000/ min
Steam pressure: 19 bar
Steam temperature: 320 ºC
Pgedpewqp U Ejfx Abpju
Number of Extractions:1+3
Operation hours: 201000
The equipment is from year 1995 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 4 700 x 6 200 mm,
Weight: 93 000
Generator, gearbox, condenser, condenser pumps, oil system and all related electro and InC equipment included.
We will send all technical data on request.
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. GO was carried out by the turbine manufacturer. The last GO was carried out in 2017 for a total amount of 112.6 million CZK. The following repairs were carried out:
- replacement of the old rotor with a new one,
- repair of the flow section of the stator and the distributor wheels and supports,
- replacement of the gearbox,
- repair of the regulation, oil. Repair of the system, condensation,
- installation of irrigation and new NZ,
Maintenance and servicing was carried out in the years after the GO, the inspection for subsequent repair was planned for 2024 and did not take place.
Manufacturer: Škoda Plzeň
Power: 25 000 kW
Type:
RPM: 3000/ min
Steam pressure: 19 bar
Steam temperature: 320 ºC
Pgedpewqp U Ejfx Abpju
Number of Extractions:1+3
Operation hours: 201000
The equipment is from year 1995 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 4 700 x 6 200 mm,
Weight: 93 000
Generator, gearbox, condenser, condenser pumps, oil system and all related electro and InC equipment included.
We will send all technical data on request.
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. GO was carried out by the turbine manufacturer. The last GO was carried out in 2017 for a total amount of 112.6 million CZK. The following repairs were carried out:
- replacement of the old rotor with a new one,
- repair of the flow section of the stator and the distributor wheels and supports,
- replacement of the gearbox,
- repair of the regulation, oil. Repair of the system, condensation,
- installation of irrigation and new NZ,
Maintenance and servicing was carried out in the years after the GO, the inspection for subsequent repair was planned for 2024 and did not take place.
Ofrues
Shënim: Regjistrohuni falas ose hyni, për të parë të gjitha informacionet.
Dërgo kërkesë
Telefon & Faks
+420 370 ... njoftime
Këto njoftime mund t'ju interesojnë edhe ju.
njoftim i vogël
Republika Çeke
973 km
Turbinë me avull
Škoda PlzeňTurbogenerator set 25MW
Škoda PlzeňTurbogenerator set 25MW
Njoftimi juaj u fshi me sukses
Ndodhi një gabim