Pastroni Dhomën ISO 8
Pastroni Dhomën ISO 8
EXW VB plus TVSH
50 000 €
Viti i prodhimit
2020
Gjendje
I përdorur
Vendndodhje
Łódź 

Fotot tregojnë
Shfaq hartën
Të dhëna për makinën
- Përshkrimi i makinës:
- Pastroni Dhomën ISO 8
- Viti i prodhimit:
- 2020
- Gjendje:
- shumë mirë (i përdorur)
- Funksionalitet:
- plotësisht funksionale
Çmimi & Vendndodhja
EXW VB plus TVSH
50 000 €
- Vendndodhje:
- Łódź, Polonia

Telefononi
Detajet e ofertës
- ID e shpalljes:
- A14477200
- Përditësim:
- së fundmi më 02.01.2024
Përshkrim
CLEANROOM - ISO 8
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
Ijdsq H H Ruepfx Ad Toht
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
Njoftimi është përkthyer automatikisht. Mund të ketë gabime në përkthim.
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
Ijdsq H H Ruepfx Ad Toht
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
Njoftimi është përkthyer automatikisht. Mund të ketë gabime në përkthim.
Ofrues
Shënim: Regjistrohuni falas ose hyni, për të parë të gjitha informacionet.
I regjistruar që nga: 2023
Dërgo kërkesë
Telefon & Faks
+48 728 4... njoftime
Këto njoftime mund t'ju interesojnë edhe ju.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Plzeňský kraj
1 074 km
Makinë matëse e koordinatave
ZeissT-Scan Hawk
ZeissT-Scan Hawk
Njoftim i vogël
Ahaus
1 573 km
Vinç shtyllash
ABUSLS / 4000 MM x 500 KG
ABUSLS / 4000 MM x 500 KG
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 170 km
Vinç shtyllash
KonecranesM25-2,5
KonecranesM25-2,5
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 170 km
Vinç i brendshëm
KonecranesSingle-Girder Overhead Crane 3,2t CXTS
KonecranesSingle-Girder Overhead Crane 3,2t CXTS
Njoftim i vogël
Graben-Neudorf
1 276 km
Makinë paketimi me vakum
GEAPowerPak XT 420
GEAPowerPak XT 420
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 170 km
Vinç i brendshëm
KonecranesCXT40410040A36FCL0S
KonecranesCXT40410040A36FCL0S
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 170 km
Vinç i sipërm
KonecranesS05M12063 / 6,3 t
KonecranesS05M12063 / 6,3 t
Njoftim i vogël
Niederlangen
1 627 km
Thithjet
NOVUSAirtower FT 20.000
NOVUSAirtower FT 20.000
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 070 km
LATHE
FamotMexpol TUM-35
FamotMexpol TUM-35
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 070 km
Makinë mulliri universale
MahoMH 400 Universal
MahoMH 400 Universal
Njoftim i vogël
Krotoszyn
1 192 km
Paketues/makinë paketimi
MultivacR230
MultivacR230
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Nordrhein-Westfalen
1 536 km
Frena e shtypit
Hezinger/RicoPRCB.30100
Hezinger/RicoPRCB.30100
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Województwo wielkopolskie
1 267 km
Sharrë panelesh
SchellingFXH 430
SchellingFXH 430
Njoftim i vogël
Braunschweig
1 441 km
Makinë për paketim termoformues/flluskash
AUTOVAKM320
AUTOVAKM320
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Województwo wielkopolskie
1 267 km
Qendër përpunuese
Optimat WeekeBP 155
Optimat WeekeBP 155
Njoftimi juaj u fshi me sukses
Ndodhi një gabim

































































































































































































