Pastroni Dhomën ISO 8
Pastroni Dhomën ISO 8
EXW VB plus TVSH
50 000 €
Viti i prodhimit
2020
Gjendje
I përdorur
(plotësisht funksionale)
Vendndodhje
Łódź 

Të dhëna bazë
- Përshkrimi i makinës:
- Pastroni Dhomën ISO 8
- Viti i prodhimit:
- 2020
- Gjendje:
- shumë mirë (i përdorur)
- Funksionalitet:
- plotësisht funksionale
Çmimi & Vendndodhja
EXW VB plus TVSH
50 000 €
- Vendndodhje:
- Łódź, Polonia

Telefononi
Detajet e ofertës
- ID e shpalljes:
- A14477200
- Përditësim:
- së fundmi më 02.01.2024
Përshkrim
CLEANROOM - ISO 8
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Cedeq H H Ruopfx Abwjhc
Technical data attached to the photos.
Njoftimi është përkthyer automatikisht. Mund të ketë gabime në përkthim.
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Cedeq H H Ruopfx Abwjhc
Technical data attached to the photos.
Njoftimi është përkthyer automatikisht. Mund të ketë gabime në përkthim.
Ofrues
Shënim: Regjistrohuni falas ose hyni, për të parë të gjitha informacionet.
I regjistruar që nga: 2023
1 Njoftimi online
Dërgo kërkesë
Telefon & Faks
+48 728 4... njoftime
Këto njoftime mund t'ju interesojnë edhe ju.
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Gjermania
1 340 km
Robot industrial
YaskawaMH12F-6Ppro / FMB Unirobot
YaskawaMH12F-6Ppro / FMB Unirobot
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Michałów
1 186 km
Gjenerator avulli, gjenerator avulli me ngrohje të shpejtë
JumagDG 360
JumagDG 360
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Gjermania
1 340 km
Qendër e përpunimit vertikal
HedeliusRS 80 K 2300
HedeliusRS 80 K 2300
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Bateria 06/2023 | Servisi + Kontrolli i Sigurisë (UVV) 07/2027
LindeE 18
LindeE 18
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Essen
1 526 km
Bojler me avull
BoschU-MB 2.000 kg/h x 13 bar
BoschU-MB 2.000 kg/h x 13 bar
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Bateria 06/2023 | Servisi + Kontrolli i Sigurisë (UVV) 07/2027
LindeE 18
LindeE 18
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Bateria 10/2017 | Servisi + Inspektimi i Sigurisë Teknike (UVV) 07/2027
StillRX 60-50
StillRX 60-50
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Wuppertal
1 502 km
Shtyp shtypi
HESSMERT160 EST
HESSMERT160 EST
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Shërbimi i vitit 2020 + Kontrolli teknik (UVV) deri më 04/2027, 992 orë pune
StillRX 60-50
StillRX 60-50
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Shërbimi 2022 + kontrolli UVV deri në 09/2027, 7.209 orë pune
LindeL 14AP
LindeL 14AP
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Hamburg
1 576 km
Ashensor magazinimi
ModulaLift ML 50D
ModulaLift ML 50D
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Shërbimi 2019 + kontrolli i pajtueshmërisë me UVV deri në 09/2027, 2.384 orë pune
LindeT 20AP
LindeT 20AP
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Shërbimi në vitin 2020 + kontrolli UVV deri më 09/2027, 1288 orë pune
ToyotaLPD 200
ToyotaLPD 200
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Weert
1 580 km
Robot industrial i riparuar + garanci
KUKAKR210 R3100 ultra KRC4
KUKAKR210 R3100 ultra KRC4
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Shërbimi i vitit 2021 + kontrolli UVV deri më 09/2027, 1.801 orë punë
LindeT 20AP
LindeT 20AP
Njoftimi juaj u fshi me sukses
Ndodhi një gabim





























































































































































































































































