Të njiheni me makinerinë e shtytjes së drejtuarFIJALO-POLAND
ALUSTEER
Të njiheni me makinerinë e shtytjes së drejtuar
FIJALO-POLAND
ALUSTEER
VB plus TVSH
20 000 €
Viti i prodhimit
2025
Gjendje
I ri
Vendndodhje
Gdańsk 

Fotot tregojnë
Shfaq hartën
Të dhëna për makinën
- Përshkrimi i makinës:
- Të njiheni me makinerinë e shtytjes së drejtuar
- Prodhues:
- FIJALO-POLAND
- Model:
- ALUSTEER
- Viti i prodhimit:
- 2025
- Gjendje:
- i ri
- Funksionalitet:
- plotësisht funksionale
Çmimi & Vendndodhja
VB plus TVSH
20 000 €
- Vendndodhje:
- Gdańsk, Polonia

Telefononi
Detaje teknike
- Peshë totale:
- 105 kg
Detajet e ofertës
- ID e shpalljes:
- A20552370
- Përditësim:
- së fundmi më 06.03.2026
Përshkrim
What is controlled jacking?
Controlled jacking is a trenchless technology that allows underground installations—such as water pipes, sewage pipes, power cables, electrical cables, telecommunications cables, fiber optic cables, water pipes, and sewage pipes—to be laid without the need for extensive excavation. The jacking machine is hydraulically driven and equipped with a pilot head that can be used to correct the path of the jacking.
Thanks to measuring systems, the operator controls the depth and direction of the jacking, which allows for high precision, even with passages several dozen meters long, in situations where accuracy and precise avoidance of obstacles in the terrain are important in order not to damage the existing infrastructure and to safely bypass it.
This solution is particularly valued in places where earthworks are difficult or impossible, e.g., under roads, lawns, tram tracks, parking lots, sidewalks, or urban areas.
Why use controlled pipe jacking?
Controlled pipe jacking is an alternative to traditional excavation, eliminating the need to dig up the surface. This method significantly reduces the time needed to complete the project, lowers the cost of restoring the site to its original condition, and minimizes the impact on traffic and the environment.
The most important advantages of controlled pipe jacking technology:
- no need to interfere with above-ground infrastructure,
- the ability to work under obstacles (e.g., roads, sidewalks, lawns, property entrances, railroad tracks),
- reduction of noise,
- vibrations, and environmental pollution,
- high route accuracy,
- quick mobilization of equipment and short completion time,
- lower risk of collision with existing installations.
- no need to use bentonite slurry,
- no spoil during jacking
Thanks to these features, controlled jacking is commonly used in the construction of municipal networks, water and sewage connections, gas, fiber optic and cable connections.
Hsdpfx Ajxxhzwsbask
Application of controlled jacking
Controlled jacking is ideal wherever installation is required without disrupting the surrounding area.
The most common applications for jacking machines are:
- crossings under roads and streets with heavy traffic,
- jacking under railway and tram tracks,
- crossings under watercourses and canals,
-installations under sidewalks, parking lots, squares, and industrial areas,
- connections to properties without digging up the entire area.
With the ALUSTEER product, no drilling mud (bentonite) is used, which significantly reduces implementation costs and environmental impact.
This technology can be used both in cities and in non-urban areas – wherever precision, speed, and reduced impact are important.
Accuracy and direction control
Modern jacking machines use sensors that enable continuous monitoring of the head position. The operator tracks the parameters on the receiver and operator tablet and reacts in case of deviations from the planned route.
Such solutions ensure:
- high precision of the breakthrough,
- safety for the existing infrastructure,
- repeatability and predictability of results.
In practice, deviations from the jacking axis are usually no more than a few centimeters, which is fully acceptable in most projects.
Controlled jacking is a trenchless technology that allows underground installations—such as water pipes, sewage pipes, power cables, electrical cables, telecommunications cables, fiber optic cables, water pipes, and sewage pipes—to be laid without the need for extensive excavation. The jacking machine is hydraulically driven and equipped with a pilot head that can be used to correct the path of the jacking.
Thanks to measuring systems, the operator controls the depth and direction of the jacking, which allows for high precision, even with passages several dozen meters long, in situations where accuracy and precise avoidance of obstacles in the terrain are important in order not to damage the existing infrastructure and to safely bypass it.
This solution is particularly valued in places where earthworks are difficult or impossible, e.g., under roads, lawns, tram tracks, parking lots, sidewalks, or urban areas.
Why use controlled pipe jacking?
Controlled pipe jacking is an alternative to traditional excavation, eliminating the need to dig up the surface. This method significantly reduces the time needed to complete the project, lowers the cost of restoring the site to its original condition, and minimizes the impact on traffic and the environment.
The most important advantages of controlled pipe jacking technology:
- no need to interfere with above-ground infrastructure,
- the ability to work under obstacles (e.g., roads, sidewalks, lawns, property entrances, railroad tracks),
- reduction of noise,
- vibrations, and environmental pollution,
- high route accuracy,
- quick mobilization of equipment and short completion time,
- lower risk of collision with existing installations.
- no need to use bentonite slurry,
- no spoil during jacking
Thanks to these features, controlled jacking is commonly used in the construction of municipal networks, water and sewage connections, gas, fiber optic and cable connections.
Hsdpfx Ajxxhzwsbask
Application of controlled jacking
Controlled jacking is ideal wherever installation is required without disrupting the surrounding area.
The most common applications for jacking machines are:
- crossings under roads and streets with heavy traffic,
- jacking under railway and tram tracks,
- crossings under watercourses and canals,
-installations under sidewalks, parking lots, squares, and industrial areas,
- connections to properties without digging up the entire area.
With the ALUSTEER product, no drilling mud (bentonite) is used, which significantly reduces implementation costs and environmental impact.
This technology can be used both in cities and in non-urban areas – wherever precision, speed, and reduced impact are important.
Accuracy and direction control
Modern jacking machines use sensors that enable continuous monitoring of the head position. The operator tracks the parameters on the receiver and operator tablet and reacts in case of deviations from the planned route.
Such solutions ensure:
- high precision of the breakthrough,
- safety for the existing infrastructure,
- repeatability and predictability of results.
In practice, deviations from the jacking axis are usually no more than a few centimeters, which is fully acceptable in most projects.
Ofrues
Shënim: Regjistrohuni falas ose hyni, për të parë të gjitha informacionet.
I regjistruar që nga: 2025
1 Njoftimi online
Dërgo kërkesë
Telefon & Faks
+48 534 9... njoftime
Këto njoftime mund t'ju interesojnë edhe ju.
Njoftim i vogël
Andelst
1 625 km
Vinç i gjithë terrenit
ZoomlionQY25V51.5 25 TONS CRANE/KRAN/GRUA/KRAAN
ZoomlionQY25V51.5 25 TONS CRANE/KRAN/GRUA/KRAAN
Njoftim i vogël
Gilze
1 639 km
Kamion me vinç
VolvoFH 540 10x4 / ERKIN 245.000 L 7+5 / WINCH
VolvoFH 540 10x4 / ERKIN 245.000 L 7+5 / WINCH
Njoftim i vogël
Kaufungen
1 387 km
Vinç i montuar në kamion
SCANIAR500 6x4 Pritsche mit Kran Palfinger PK53002 SH
SCANIAR500 6x4 Pritsche mit Kran Palfinger PK53002 SH
Njoftim i vogël
Waltrop
1 518 km
Gjysëm-rimorkio
LangendorfSBH/09G Innenlader Beton für Betonteile
LangendorfSBH/09G Innenlader Beton für Betonteile
Njoftim i vogël
Wijchen
1 615 km
Makineri rrethbluarëse WMW SIP 315x500
WMWSIP 315x500
WMWSIP 315x500
Njoftim i vogël
Norken
1 419 km
Tavolinë rrotulluese Nikken, boshti i 4-të CNC 400
NikkenRundtisch
NikkenRundtisch
Njoftim i vogël
Gjermania
1 286 km
Makinë mulliri shtrati - universale
Erste Maschinenfabrik AuerbachFBE 1500
Erste Maschinenfabrik AuerbachFBE 1500
Njoftim i vogël
Wallerstein
1 148 km
Torno CNC
SpinnerTC400
SpinnerTC400
Njoftim i vogël
Lehrte
1 461 km
Vinç kulle
FAUNRTF 40-3 Mobilkran
FAUNRTF 40-3 Mobilkran
Njoftim i vogël
Bree
1 574 km
Kamion me vinç
VolvoFH 440 (EFFER 850S + FLY JIB 6S / BE TRUCK / WI...
VolvoFH 440 (EFFER 850S + FLY JIB 6S / BE TRUCK / WI...
Njoftimi juaj u fshi me sukses
Ndodhi një gabim














































































































































































