Të njiheni me makinerinë e shtytjes së drejtuarFIJALO-POLAND
ALUSTEER
Të njiheni me makinerinë e shtytjes së drejtuar
FIJALO-POLAND
ALUSTEER
VB plus TVSH
20 000 €
Viti i prodhimit
2025
Gjendje
I ri
(plotësisht funksionale)
Vendndodhje
Gdańsk 

Të dhëna për makinën
- Përshkrimi i makinës:
- Të njiheni me makinerinë e shtytjes së drejtuar
- Prodhues:
- FIJALO-POLAND
- Model:
- ALUSTEER
- Viti i prodhimit:
- 2025
- Gjendje:
- i ri
- Funksionalitet:
- plotësisht funksionale
Çmimi & Vendndodhja
VB plus TVSH
20 000 €
- Vendndodhje:
- Gdańsk, Polonia

Telefononi
Detaje teknike
- Peshë totale:
- 105 kg
Detajet e ofertës
- ID e shpalljes:
- A20552370
- Përditësim:
- së fundmi më 06.03.2026
Përshkrim
What is controlled jacking?
Controlled jacking is a trenchless technology that allows underground installations—such as water pipes, sewage pipes, power cables, electrical cables, telecommunications cables, fiber optic cables, water pipes, and sewage pipes—to be laid without the need for extensive excavation. The jacking machine is hydraulically driven and equipped with a pilot head that can be used to correct the path of the jacking.
Thanks to measuring systems, the operator controls the depth and direction of the jacking, which allows for high precision, even with passages several dozen meters long, in situations where accuracy and precise avoidance of obstacles in the terrain are important in order not to damage the existing infrastructure and to safely bypass it.
This solution is particularly valued in places where earthworks are difficult or impossible, e.g., under roads, lawns, tram tracks, parking lots, sidewalks, or urban areas.
Why use controlled pipe jacking?
Controlled pipe jacking is an alternative to traditional excavation, eliminating the need to dig up the surface. This method significantly reduces the time needed to complete the project, lowers the cost of restoring the site to its original condition, and minimizes the impact on traffic and the environment.
The most important advantages of controlled pipe jacking technology:
- no need to interfere with above-ground infrastructure,
- the ability to work under obstacles (e.g., roads, sidewalks, lawns, property entrances, railroad tracks),
- reduction of noise,
- vibrations, and environmental pollution,
- high route accuracy,
- quick mobilization of equipment and short completion time,
- lower risk of collision with existing installations.
- no need to use bentonite slurry,
- no spoil during jacking
Thanks to these features, controlled jacking is commonly used in the construction of municipal networks, water and sewage connections, gas, fiber optic and cable connections.
Application of controlled jacking
Controlled jacking is ideal wherever installation is required without disrupting the surrounding area.
The most common applications for jacking machines are:
- crossings under roads and streets with heavy traffic,
Nodpfx Abexxhzwjnowi
- jacking under railway and tram tracks,
- crossings under watercourses and canals,
-installations under sidewalks, parking lots, squares, and industrial areas,
- connections to properties without digging up the entire area.
With the ALUSTEER product, no drilling mud (bentonite) is used, which significantly reduces implementation costs and environmental impact.
This technology can be used both in cities and in non-urban areas – wherever precision, speed, and reduced impact are important.
Accuracy and direction control
Modern jacking machines use sensors that enable continuous monitoring of the head position. The operator tracks the parameters on the receiver and operator tablet and reacts in case of deviations from the planned route.
Such solutions ensure:
- high precision of the breakthrough,
- safety for the existing infrastructure,
- repeatability and predictability of results.
In practice, deviations from the jacking axis are usually no more than a few centimeters, which is fully acceptable in most projects.
Controlled jacking is a trenchless technology that allows underground installations—such as water pipes, sewage pipes, power cables, electrical cables, telecommunications cables, fiber optic cables, water pipes, and sewage pipes—to be laid without the need for extensive excavation. The jacking machine is hydraulically driven and equipped with a pilot head that can be used to correct the path of the jacking.
Thanks to measuring systems, the operator controls the depth and direction of the jacking, which allows for high precision, even with passages several dozen meters long, in situations where accuracy and precise avoidance of obstacles in the terrain are important in order not to damage the existing infrastructure and to safely bypass it.
This solution is particularly valued in places where earthworks are difficult or impossible, e.g., under roads, lawns, tram tracks, parking lots, sidewalks, or urban areas.
Why use controlled pipe jacking?
Controlled pipe jacking is an alternative to traditional excavation, eliminating the need to dig up the surface. This method significantly reduces the time needed to complete the project, lowers the cost of restoring the site to its original condition, and minimizes the impact on traffic and the environment.
The most important advantages of controlled pipe jacking technology:
- no need to interfere with above-ground infrastructure,
- the ability to work under obstacles (e.g., roads, sidewalks, lawns, property entrances, railroad tracks),
- reduction of noise,
- vibrations, and environmental pollution,
- high route accuracy,
- quick mobilization of equipment and short completion time,
- lower risk of collision with existing installations.
- no need to use bentonite slurry,
- no spoil during jacking
Thanks to these features, controlled jacking is commonly used in the construction of municipal networks, water and sewage connections, gas, fiber optic and cable connections.
Application of controlled jacking
Controlled jacking is ideal wherever installation is required without disrupting the surrounding area.
The most common applications for jacking machines are:
- crossings under roads and streets with heavy traffic,
Nodpfx Abexxhzwjnowi
- jacking under railway and tram tracks,
- crossings under watercourses and canals,
-installations under sidewalks, parking lots, squares, and industrial areas,
- connections to properties without digging up the entire area.
With the ALUSTEER product, no drilling mud (bentonite) is used, which significantly reduces implementation costs and environmental impact.
This technology can be used both in cities and in non-urban areas – wherever precision, speed, and reduced impact are important.
Accuracy and direction control
Modern jacking machines use sensors that enable continuous monitoring of the head position. The operator tracks the parameters on the receiver and operator tablet and reacts in case of deviations from the planned route.
Such solutions ensure:
- high precision of the breakthrough,
- safety for the existing infrastructure,
- repeatability and predictability of results.
In practice, deviations from the jacking axis are usually no more than a few centimeters, which is fully acceptable in most projects.
Ofrues
Shënim: Regjistrohuni falas ose hyni, për të parë të gjitha informacionet.
I regjistruar që nga: 2025
1 Njoftimi online
Dërgo kërkesë
Telefon & Faks
+48 534 9... njoftime
Këto njoftime mund t'ju interesojnë edhe ju.
Njoftim i vogël
Barcin
1 313 km
Pirunë ngritës terreni 5T 4x4 CE
5T CE
5T CE
Njoftim i vogël
Andelst
1 625 km
SZM standarde
VolvoFH 540 8X4 TREKKER / BAKWAGEN MET PALFINGER PK1...
VolvoFH 540 8X4 TREKKER / BAKWAGEN MET PALFINGER PK1...
Njoftim i vogël
Wijchen
1 615 km
Makineri rrethbluarëse WMW SIP 315x500
WMWSIP 315x500
WMWSIP 315x500
Njoftim i vogël
Lehrte
1 461 km
Vinç kulle
FAUNRTF 40-3 Mobilkran
FAUNRTF 40-3 Mobilkran
Njoftim i vogël
Andelst
1 625 km
Kamion me vinç
ScaniaG450 8X4 BAKWAGEN + PALFINGER PK 110002 = JIB P...
ScaniaG450 8X4 BAKWAGEN + PALFINGER PK 110002 = JIB P...
Njoftim i vogël
Gjermania
1 286 km
Makinë mulliri shtrati - universale
Erste Maschinenfabrik AuerbachFBE 1500
Erste Maschinenfabrik AuerbachFBE 1500
Njoftim i vogël
HETEREN
1 625 km
Sistemi i krahut me grep
VolvoFMX 500 FMX 500 8x4 HIAB 422 E-8 Hipro + HIAB H...
VolvoFMX 500 FMX 500 8x4 HIAB 422 E-8 Hipro + HIAB H...
Njoftim i vogël
Andelst
1 625 km
Kamion me vinç
VolvoFH 16.650 8X2 + EFFER 1855/8S + JIB 6S HEAVY DU...
VolvoFH 16.650 8X2 + EFFER 1855/8S + JIB 6S HEAVY DU...
Njoftim i vogël
Gjermania
1 340 km
Torno CNC
MONFORTSRNC 200 A
MONFORTSRNC 200 A
Njoftim i vogël
Lahr
1 260 km
Vinç i montuar në kamion
SCANIAR 420 8x4 Wechselaufbau Kran 80t Fassi Funk
SCANIAR 420 8x4 Wechselaufbau Kran 80t Fassi Funk
Njoftimi juaj u fshi me sukses
Ndodhi një gabim














































































































































































