Dhomë zhveshjeje për ambient të pastërULKEY
Dhomë zhveshjeje për ambient të pastër
ULKEY
Viti i prodhimit
2017
Gjendje
I përdorur
Vendndodhje
Tamási 

Fotot tregojnë
Shfaq hartën
Të dhëna për makinën
- Përshkrimi i makinës:
- Dhomë zhveshjeje për ambient të pastër
- Prodhues:
- ULKEY
- Viti i prodhimit:
- 2017
- Gjendje:
- mirë (i përdorur)
Çmimi & Vendndodhja
- Vendndodhje:
- Tamási, 7090 Ungarn

Telefononi
Detajet e ofertës
- ID e shpalljes:
- A21169237
- Numri i referencës:
- 8000001
- Përditësim:
- së fundmi më 05.02.2026
Përshkrim
Changing Room and Personal Entry Area:
Dimensions: 2000 x 2000 x 3000 mm
The changing room is divided into two zones: a gray zone and a white zone.
In the gray zone, personnel remove the footwear and gowns worn in the assembly area, sit on the bench separating the zones, and change into cleanroom footwear and gowns. Whenever personnel leave the cleanroom during operations, they must always change their attire upon re-entry.
Cleanroom:
Dimensions: 5500 x 4500 x 3000 mm
The goods-in zone is separated from the cleanroom adhesive area (1750 x 750 x 3000 mm).
Doors and windows between the goods-in zone and the cleanroom are interlocked; only one door or window can be opened at a time.
Upon entry: doors only open after a 6-minute delay, except when issuing storage devices, when no 6-minute lockout is applied.
After processing, the glued products are mechanically transferred to the assembly area via a pass-through window. Delivery windows must always be closed after the transfer process.
The cleanroom is pressurized, regulated via control dampers.
Air of ISO8 quality is supplied to the cleanroom through filters installed in the air handling unit.
Air handling units are installed on the support structure above the cleanroom ceiling.
Air cleanliness is continuously monitored and recorded.
If air cleanliness falls below acceptable levels, a visual alarm notifies personnel, or intervention in the production process occurs and doors and windows are locked.
Supply Fan:
Air volume: 8,000 m³/h
Static pressure: 400 Pa
400 V, 50 Hz, k kW
With silencer
Ventilation ductwork
HEPA filter
Frame Structure:
Powder-coated
Manufactured from cold-rolled profile materials
Codpfx Abeyhbczexegn
Side Walls, Roof Structure:
LV80 Kingspan sandwich panels
3 fixed windows, transparent and thermally insulated
2 entry doors, each with a fixed, transparent upper window
2 hatch doors, each with a fixed, transparent upper window
1 outlet opening with sliding window sash
Electrical Control:
Electrical distribution cabinet
Control cabinet
Frequency converter
Measuring instruments
Monitoring System:
Vision monitoring system
Data storage computing unit (laptop)
Changing Room Furnishings:
Gray zone:
- Shoe storage
- Coat storage
- Hanging zone
- Dividing floor
Njoftimi është përkthyer automatikisht. Mund të ketë gabime në përkthim.
Dimensions: 2000 x 2000 x 3000 mm
The changing room is divided into two zones: a gray zone and a white zone.
In the gray zone, personnel remove the footwear and gowns worn in the assembly area, sit on the bench separating the zones, and change into cleanroom footwear and gowns. Whenever personnel leave the cleanroom during operations, they must always change their attire upon re-entry.
Cleanroom:
Dimensions: 5500 x 4500 x 3000 mm
The goods-in zone is separated from the cleanroom adhesive area (1750 x 750 x 3000 mm).
Doors and windows between the goods-in zone and the cleanroom are interlocked; only one door or window can be opened at a time.
Upon entry: doors only open after a 6-minute delay, except when issuing storage devices, when no 6-minute lockout is applied.
After processing, the glued products are mechanically transferred to the assembly area via a pass-through window. Delivery windows must always be closed after the transfer process.
The cleanroom is pressurized, regulated via control dampers.
Air of ISO8 quality is supplied to the cleanroom through filters installed in the air handling unit.
Air handling units are installed on the support structure above the cleanroom ceiling.
Air cleanliness is continuously monitored and recorded.
If air cleanliness falls below acceptable levels, a visual alarm notifies personnel, or intervention in the production process occurs and doors and windows are locked.
Supply Fan:
Air volume: 8,000 m³/h
Static pressure: 400 Pa
400 V, 50 Hz, k kW
With silencer
Ventilation ductwork
HEPA filter
Frame Structure:
Powder-coated
Manufactured from cold-rolled profile materials
Codpfx Abeyhbczexegn
Side Walls, Roof Structure:
LV80 Kingspan sandwich panels
3 fixed windows, transparent and thermally insulated
2 entry doors, each with a fixed, transparent upper window
2 hatch doors, each with a fixed, transparent upper window
1 outlet opening with sliding window sash
Electrical Control:
Electrical distribution cabinet
Control cabinet
Frequency converter
Measuring instruments
Monitoring System:
Vision monitoring system
Data storage computing unit (laptop)
Changing Room Furnishings:
Gray zone:
- Shoe storage
- Coat storage
- Hanging zone
- Dividing floor
Njoftimi është përkthyer automatikisht. Mund të ketë gabime në përkthim.
Ofrues
Shënim: Regjistrohuni falas ose hyni, për të parë të gjitha informacionet.
Dërgo kërkesë
Telefon & Faks
+49 8151 ... njoftime
Njoftimi juaj u fshi me sukses
Ndodhi një gabim









































