Dyqan ngjyrashPony Luxury Coating
Pony L11000 (11x5x5)
Dyqan ngjyrash
Pony Luxury Coating
Pony L11000 (11x5x5)
çmim fiks plus TVSH
81 250 €
Viti i prodhimit
2025
Gjendje
I ri
Vendndodhje
Würzburg 

Fotot tregojnë
Shfaq hartën
Të dhëna për makinën
- Përshkrimi i makinës:
- Dyqan ngjyrash
- Prodhues:
- Pony Luxury Coating
- Model:
- Pony L11000 (11x5x5)
- Viti i prodhimit:
- 2025
- Gjendje:
- i ri
- Funksionalitet:
- plotësisht funksionale
Çmimi & Vendndodhja
çmim fiks plus TVSH
81 250 €
- Vendndodhje:
- Würzburg, Gjermania

Detaje teknike
- Lartësia totale:
- 5 600 mm
- Gjatësia totale:
- 11 200 mm
- Gjerësia totale:
- 5 100 mm
- Lloji i rrymës hyrëse:
- tre fazë
- Kohëzgjatja e garancisë:
- 24 muaj
- Lartësia e brendshme:
- 4 970 mm
- Gjatësia e brendshme:
- 11 000 mm
- Temperatura:
- 80 °C
- Gjerësia e brendshme:
- 5 000 mm
- Kërkesa për ajër:
- 52 000 m³/h
- Tensioni hyrës:
- 380 V
- Kapaciteti i ngrohjes:
- 250 kW (339,91 HP)
- Fuqi:
- 45 kW (61,18 HP)
- Karburant:
- gaz i lëngshëm nafte (LPG)
- Frekuenca e hyrjes:
- 50 Hz
- Konsumi i energjisë:
- 45 kWh
- Trashësia e izolimit:
- 50 mm
- Fuqi nominale:
- 250 kW (339,91 HP)
- Trashësia maksimale e fletës prej çeliku:
- 2 mm
- Pajisje:
- ndriçim
Detajet e ofertës
- ID e shpalljes:
- A19572531
- Përditësim:
- së fundmi më 15.01.2026
Përshkrim
* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
Bjdewzl Hxjpfx Abxswh
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Njoftimi është përkthyer automatikisht. Mund të ketë gabime në përkthim.
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
Bjdewzl Hxjpfx Abxswh
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Njoftimi është përkthyer automatikisht. Mund të ketë gabime në përkthim.
Dokumente
Dërgo kërkesë
Këto njoftime mund t'ju interesojnë edhe ju.
Njoftim i vogël
Gemmingen
1 248 km
Makinë për heqjen e burrave të llamarinës / makinë për heqjen e burrave
NS MaquinasDM 1100 C
NS MaquinasDM 1100 C
Njoftim i vogël
Rheinbach
1 465 km
Muri i thatë me llak Spray mur Paint mur
D&MTSWc 3x2 10.800 m³/h
D&MTSWc 3x2 10.800 m³/h
Njoftim i vogël
Bergeijk
1 602 km
Makinë për heqjen dhe përfundimin Q-Fin SER600
Q-Fin Quality Finishing MachinesQ-Fin SER600 - MAG TS
Q-Fin Quality Finishing MachinesQ-Fin SER600 - MAG TS
Njoftim i vogël
Toruń
1 328 km
Kabina lyerjeje 12x5x5 m me strukturë poshte
ABC-Group
ABC-Group
Njoftim i vogël
Luckenwalde
1 328 km
Sistemet e pikturimit të lagur hap pas hapi
PROTONSTP-STP
PROTONSTP-STP
Njoftim i vogël
Büyükkayacık OSB
1 122 km
Ngarkues i ulët
GVN Trailer3 Axle Hydraulic Platform Lowbed
GVN Trailer3 Axle Hydraulic Platform Lowbed
Njoftim i vogël
Nettetal
1 550 km
Furrë pluhur
KM IndustrieserviceElektro Kammerofen KM Pro
KM IndustrieserviceElektro Kammerofen KM Pro
Njoftim i vogël
Parma
899 km
Makineri ndërtimi me ngarkues të ulët
CEYLAN carrellone rampe idrauliche nuovo
CEYLAN carrellone rampe idrauliche nuovo
Njoftim i vogël
Büyükkayacık OSB
1 122 km
Ngarkues i ulët
GVN Trailer3 Axle Tramex Platform Lowbed
GVN Trailer3 Axle Tramex Platform Lowbed
Njoftim i vogël
Möttingen
1 137 km
Fabrika industriale e veshjes me pluhur
SAPI GmbH PulverbeschichtungsanlageKomplettsystem für industrielle
SAPI GmbH PulverbeschichtungsanlageKomplettsystem für industrielle
Njoftimi juaj u fshi me sukses
Ndodhi një gabim





















































































