Dyqan ngjyrashPony Luxury Coating
Pony L11000 (11x5x5)
Dyqan ngjyrash
Pony Luxury Coating
Pony L11000 (11x5x5)
Çmim fiks plus TVSH
81 250 €
Viti i prodhimit
2025
Gjendje
I ri
(plotësisht funksionale)
Vendndodhje
Würzburg 

Të dhëna bazë
- Përshkrimi i makinës:
- Dyqan ngjyrash
- Prodhues:
- Pony Luxury Coating
- Model:
- Pony L11000 (11x5x5)
- Viti i prodhimit:
- 2025
- Gjendje:
- i ri
- Funksionalitet:
- plotësisht funksionale
Çmimi & Vendndodhja
Çmim fiks plus TVSH
81 250 €
- Vendndodhje:
- Schulstr 3, 97084 Würzburg, Deutschland

Telefononi
Detaje teknike
Dimensionet dhe pesha
Gjatësia totale:
11 200 mm
Gjerësia totale:
5 100 mm
Lartësia totale:
5 600 mm
Lartësia e brendshme:
4 970 mm
Gjatësia e brendshme:
11 000 mm
Gjerësia e brendshme:
5 000 mm
Motori dhe kutia e shpejtësisë
Karburant:
gaz i lëngshëm nafte (LPG)
Detaje të fuqisë
Tensioni hyrës:
380 V
Frekuenca e hyrjes:
50 Hz
Konsumi i energjisë:
45 kWh
Lloji i rrymës hyrëse:
tre fazë
Pajisje
Ndriçim
Dokumentacion dhe çertifikim
Kohëzgjatja e garancisë:
24 muaj
Material/produkte të përpunueshme
Trashësia maksimale e fletës prej çeliku:
2 mm
Detaje të mëtejshme
Fuqi:
45 kW (61,18 HP)
Kërkesa për ajër:
52 000 m³/h
Kapaciteti i ngrohjes:
250 kW (339,91 HP)
Trashësia e izolimit:
50 mm
Fuqi nominale:
250 kW (339,91 HP)
Temperatura:
80 °C
Detajet e ofertës
- ID e shpalljes:
- A19572531
- Përditësim:
- së fundmi më 15.01.2026
Përshkrim
* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
Knedewzl Hxepfx Anpoc
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Njoftimi është përkthyer automatikisht. Mund të ketë gabime në përkthim.
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
Knedewzl Hxepfx Anpoc
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Njoftimi është përkthyer automatikisht. Mund të ketë gabime në përkthim.
Dokumente
Ofrues
Shënim: Regjistrohuni falas ose hyni, për të parë të gjitha informacionet.
I regjistruar që nga: 2025
6 Njoftime online
Dërgo kërkesë
Telefon & Faks
+49 931 4... njoftime
Këto njoftime mund t'ju interesojnë edhe ju.
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Petershagen
1 512 km
Përkrahëse gjysmërimorkio me platformë të ulët
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Gabelstapler/Arbeitsbühnentransporter Klapprampe
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Kežmarok
889 km
Tuneli i tharjes UV
SuperficiEssiccatoio UV
SuperficiEssiccatoio UV
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Deskle
759 km
Njësi rërimi
COGEIMPG 10x15
COGEIMPG 10x15
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Finlanda
2 342 km
Njësi rërimi
Gietart
Gietart
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Würzburg
1 241 km
Dyqan ngjyrash
Pony Luxury Coating M&KPony 7000
Pony Luxury Coating M&KPony 7000
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Büyükkayacık OSB
1 124 km
Gjysmërimorkio me makinë
LiderTruck Carrier 1
LiderTruck Carrier 1
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Eisenberg (Pfalz)
1 327 km
Sistemi i veshjes me pluhur
Gema, CaldanMagic Compact BA04, Hängebahnanlage Powe
Gema, CaldanMagic Compact BA04, Hängebahnanlage Powe
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Neckartailfingen
1 193 km
Nxjerrësi i pluhurit, pajisja thithëse, filtri
mütek SystemtechnikMMJET 160
mütek SystemtechnikMMJET 160
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Metzingen
1 187 km
Makinë mulliri - universale
GELDMACHERUWF 405
GELDMACHERUWF 405
I suksesshëm
Mesazhi juaj u dërgua.
Njoftim i vogël
Wiefelstede
1 622 km
Pllakë shtrënguese me fole T
unbekannt**4930/1465/H850 mm
unbekannt**4930/1465/H850 mm
Njoftimi juaj u fshi me sukses
Ndodhi një gabim






























































































