Linja e montimit të statorit për makina elektrike (2021)
Linja e montimit të statorit për makina elektrike (2021)
Viti i prodhimit
2021
Gjendje
I përdorur
(plotësisht funksionale)
Vendndodhje
Czechowice-Dziedzice 

Të dhëna bazë
- Përshkrimi i makinës:
- Linja e montimit të statorit për makina elektrike (2021)
- Viti i prodhimit:
- 2021
- Gjendje:
- i përdorur
- Funksionalitet:
- plotësisht funksionale
Çmimi & Vendndodhja
- Vendndodhje:
- Czechowice-Dziedzice, Poland

Telefononi
Detajet e ofertës
- ID e shpalljes:
- A22114003
- Numri i referencës:
- 30581-13
- Përditësim:
- së fundmi më 29.09.2026
Përshkrim
EV Car Stator Assembly Line (2021)
Designed to produce stators with a height range of 100–210 mm and a diameter of 160 mm
Including manual, semi-automated, and fully automated operations
Cycle time: 86 s
Stations and Equipment
End Plate Sub-assembly (Gluing)
End plate Loctite gluing onto metal sheet stack and laser marking
Grob semi-automated assembly machine (2021)
Keyence laser
Stator Stack Preparation
Stator stack preparation (loading) and height measurement
7 metal sheet stacks with a height of 25 mm loaded on a rotating table
Slot Insulator Insertion
U-shaped paper insulator insertion
Grob automated assembly machine (2021)
Insertion of 48 “U”-shaped paper insulators
3x Winding Stations
3x copper wire winding stations, wire fed from barrels
Grob automated assembly machines (2021)
Maximum number of wires: 15
Insulation Tube Assembly and Cutting
6 manual stations for insulation tube assembly
1 cutting station connected via conveyor
2x Wire Pre-forming
2 automated wire pre-shaping stations
2T Kistler press
Phase Separator Assembly
6 manual phase separator assembly stations between coil assembly stations, connected via conveyor
1 rotating station for stator cradle rotation
8x Stator Hot Crimping Preparation
8 manual stations for stator hot crimping preparation
2x Connector Hot Crimping
2 electric welding machines with force and current measurement
Lingl PZ5 welding machines (2021)
10x Final Forming Preparation
10 manual stator final forming preparation stations
Final Wire Forming
Wire shaping using a 2T Kistler press
2x Lancing
2 Grob automated stator lancing machines (2021)
Lancing for stator heights of 140 mm and 210 mm
Phase Separator Cutting Station
Teknomatik semi-automated stator lifting and pre-cutting machine
Stator Stack Skewing and Laser Welding
Automated skewing, laser welding, and laser marking
KUKA robot KR 250 R2700-2/FLR (2021)
TRUMPF TruDisk 4002 welding laser (2021)
End-of-Line (EOL) Electrical Measurement
Semi-automated stations for high- and low-voltage testing
ETL ATS 400 automatic test system
ZAW resistance measurement tester (2023)
Heat Shrink Tube Assembly
Prospertech semi-automated stations for heat shrink tube placement on wires
Stator Resin Impregnation
Tedpezc N Axefx Abwoc
Automated Tecnofirma resin application and heating process
Includes:
1x induction heating zone
1x pre-heating zone
5x impregnation zones
2x infrared lamp zones
1x gelation zone
1x curing zone
Integrated Minimax firefighting system
KUKA robot KR 150 R2700-2/FLR (2021)
Designed to produce stators with a height range of 100–210 mm and a diameter of 160 mm
Including manual, semi-automated, and fully automated operations
Cycle time: 86 s
Stations and Equipment
End Plate Sub-assembly (Gluing)
End plate Loctite gluing onto metal sheet stack and laser marking
Grob semi-automated assembly machine (2021)
Keyence laser
Stator Stack Preparation
Stator stack preparation (loading) and height measurement
7 metal sheet stacks with a height of 25 mm loaded on a rotating table
Slot Insulator Insertion
U-shaped paper insulator insertion
Grob automated assembly machine (2021)
Insertion of 48 “U”-shaped paper insulators
3x Winding Stations
3x copper wire winding stations, wire fed from barrels
Grob automated assembly machines (2021)
Maximum number of wires: 15
Insulation Tube Assembly and Cutting
6 manual stations for insulation tube assembly
1 cutting station connected via conveyor
2x Wire Pre-forming
2 automated wire pre-shaping stations
2T Kistler press
Phase Separator Assembly
6 manual phase separator assembly stations between coil assembly stations, connected via conveyor
1 rotating station for stator cradle rotation
8x Stator Hot Crimping Preparation
8 manual stations for stator hot crimping preparation
2x Connector Hot Crimping
2 electric welding machines with force and current measurement
Lingl PZ5 welding machines (2021)
10x Final Forming Preparation
10 manual stator final forming preparation stations
Final Wire Forming
Wire shaping using a 2T Kistler press
2x Lancing
2 Grob automated stator lancing machines (2021)
Lancing for stator heights of 140 mm and 210 mm
Phase Separator Cutting Station
Teknomatik semi-automated stator lifting and pre-cutting machine
Stator Stack Skewing and Laser Welding
Automated skewing, laser welding, and laser marking
KUKA robot KR 250 R2700-2/FLR (2021)
TRUMPF TruDisk 4002 welding laser (2021)
End-of-Line (EOL) Electrical Measurement
Semi-automated stations for high- and low-voltage testing
ETL ATS 400 automatic test system
ZAW resistance measurement tester (2023)
Heat Shrink Tube Assembly
Prospertech semi-automated stations for heat shrink tube placement on wires
Stator Resin Impregnation
Tedpezc N Axefx Abwoc
Automated Tecnofirma resin application and heating process
Includes:
1x induction heating zone
1x pre-heating zone
5x impregnation zones
2x infrared lamp zones
1x gelation zone
1x curing zone
Integrated Minimax firefighting system
KUKA robot KR 150 R2700-2/FLR (2021)
Këto njoftime mund t'ju interesojnë edhe ju.
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Hungaria
606 km
Torno CNC
LEADWELLLTC 35CXXL
LEADWELLLTC 35CXXL
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Jihomoravský kraj
927 km
Sharrë me brez
PEGAS GONDA510x510 HERKULES X
PEGAS GONDA510x510 HERKULES X
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Sachsen
1 213 km
Qendër torno
ColchesterStudent 2500
ColchesterStudent 2500
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Makinë ngarkuese teleskopike
MerloP 38.14
MerloP 38.14
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Gjermania
1 340 km
Robot industrial
YaskawaMH12F-6Ppro / FMB Unirobot
YaskawaMH12F-6Ppro / FMB Unirobot
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Gjermania
1 340 km
Qendër e përpunimit vertikal
HedeliusRS 80 K 2300
HedeliusRS 80 K 2300
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Bateria 06/2023 | Servisi + Kontrolli i Sigurisë (UVV) 07/2027
LindeE 18
LindeE 18
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Bateria 06/2023 | Servisi + Kontrolli i Sigurisë (UVV) 07/2027
LindeE 18
LindeE 18
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Bateria 10/2017 | Servisi + Inspektimi i Sigurisë Teknike (UVV) 07/2027
StillRX 60-50
StillRX 60-50
I suksesshëm
Mesazhi juaj u dërgua.
Ankand
Përfundon në
d
h
min
s
Ankandi përfundoi
Bayern
1 061 km
Shërbimi i vitit 2020 + Kontrolli teknik (UVV) deri më 04/2027, 992 orë pune
StillRX 60-50
StillRX 60-50
Njoftimi juaj u fshi me sukses
Ndodhi një gabim


























































































































































































































